WHAT IS DRAWINGS?

The building is measured before it is built, then it is mapped with the help of AutoCAD. This map is called drawing.

A drawing is prepared before constructing any building. A drawing is needed for every building, but the drawing of a big building is very important.

WHAT IS DRAWINGS?

1.    WORKING DRAWING

 Working drawings provide dimensional, graphical information that can be used. For the construction of works by a contractor, or for the manufacture of work components by suppliers or for the collection or installation of components. These may include architectural drawings, elevations, sections, etc. These drawings are used for construction work. It shows the position of remote door windows ventilation.

 Dimensions, signs, and symbols of working drawings. It is important to have industry standards, but they also need to be clear. Includes information on working drawings or separate descriptions.

WORKING DRAWING


2. ELEVATION?

This is the front of the building. In the front part of the building, a shoe is made of everything. It's all made horizontal. The doors windows in front of the building are shown in the drawings. G.L, P.L is also shown in elevation. Dimensions are also shown with it.

ELEVATION

3. SECTION?

There are two types of sections, one is a cross-section and the other is a long section. In the cross-section, the building is cut in the middle while in the living section the bull is cut in half. It shows G.L., P.L. and wall dimensions.

SECTION

4. LAYOUT OF FOUNDATION?

The layout plan is a plan of building foundation, in drawing, showing the location and size of footings, columns, foundation walls.



LAYOUT OF FOUNDATION


5. SITE PLAN?

The open and covered area of ​​the place is shown in the site plan. A site plan usually shows water lines, sanitary sewer lines, drainage gas pipeline. They are all represented by a dotted color line.

SITE PLAN

6. KEY PLAN?

This is drawing used for marking out the plan on the ground. The place where the submission is being built up is easily wiped and what is on all four sides of the place is shown in the drawing

KEY PLAN

7. SCHEDULE?

It gives details of all the drawings. Doors, windows, and ventilation widths, height, and floor level & description are shown.